Historical

IEC 62382 Ed. 1.0 en:2006

Electrical and instrumentation loop check


"describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter)."


CONTENT PROVIDER
International Electrotechnical Commission [iec]

Others Also Bought
"Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site ...
Wiring Practices for Hazardous (Classified) Locations Instrumentation Part I: Intrinsic Safety (formerly ANSI/ISA ...
Recommendations for the Preparation, Content, and Organization of Intrinsic Safety Control Drawings
Document History
Included in Packages
This standard is not included in any packages.
Amendments & Corrections
We have no amendments or corrections for this standard.